Subrogation Mediation
- Plaintiff sought to recoup payments made to insured due to a residential fire. Plaintiff alleged that Defendant negligently installed an electrical outlet at the insured’s residence. The electrical outlet failed causing extensive fire damage. It was also alleged that the composite product used for decking accelerated the spread of the fire.
- Restaurant kitchen fire caused by design defect in improvements completed in violation of building and fire codes; failure to inspect and service.
- A house fire occurred as a result of work performed by Defendant. Plaintiff issued payments for the necessary repairs. Plaintiff sought damages from Defendant based on a claim of negligence.